SC 5 – Phase II

This project included the widening of an existing 7.5 mile two-lane roadway into a four-lane divided highway with grass medians. The project also included four large box culverts and two bridges.

Client: Eagle Construction
Category: Survey
Skills:
  • Bathymetric Survey
  • Control- Verify and Re-establish Horizontal
  • Control-Verify and Re-establish Vertical
  • Clearing Limit Staking
  • Slope Stakes
  • Storm Drain Structures
  • Storm Drain Pipe
  • Storm Drain Culverts
  • Detention Ponds
  • Fine Grading
  • Utility Staking
  • Wastewater Utilities
  • Bridge and Culvert Control
Date Completed: 2010