LRADAC Testing and Demolition

Dennis Corporation obtained the required permitting and prepared a complete site plan which included erosion control, security fencing, lighting, landscaping, sidewalks, a tie-back wall system and demolition for the former LRADAC facility. Prior to demolition, Dennis Corporation inspected and monitored air quality for asbestos abatement. During demolition, Dennis Corporation’s construction management division strictly enforced safety practices and provided flagmen to ensure only designated areas were demolished. Specific challenges included maintaining normal flow of existing vehicular and pedestrian traffic without delaying the contractor. Now that demolition and the tie-back wall system are complete, asphalt operations will commence to complete drainage issues and provide new, necessary parking.

Client: Richland County
Category: Construction Management – Building
Skills:
  • Asbestos and Lead Paint Inspection and Sampling
  • Construction Management
  • Construction Inspection
  • Demolition Monitoring
  • Safety Compliance
Completed: 2012